|
Hickory Point Property Owners Association |
|
HICKORY POINT PROPERTY OWNERS ASSOCIATION, INC. APPLICATION FOR NEW CONSTRUCTION, EXTERIOR CHANGE TO EXISTING BUILDINGS OR MAJOR PROPERTY EXCAVATING/UTILITY CHANGES Date submitted: _________________________ Lot # ____________________ Name: ________________________________________________________________ Current Resident Address: ________________________________________________ Hickory Point Address: ___________________________________________________ Telephone number: Home________________________ Office: __________________ Attach complete detailed information as required by the rules and standards, e.g. site plan, location and dimensions, contractor specifications, architectural drawings, sketches, materials etc. must be submitted in order to have application reviewed. Incomplete applications will be returned. Explanation of proposed project: _____________________________________________ _______________________________________________________________________ _______________________________________________________________________ _______________________________________________________________________
Roof Pitch_____________________ Square Footage: ____________________________ Materials: _______________________________________________________________ Location of Fuel/Propane Tanks: _____________________________________________ Proposed start date: __________________ Proposed Completion date: ______________ Contractors Name:_________________________________________________________ Company Name: __________________________________________________________ Company Address: ________________________________________________________ Telephone number: ____________________________ Fax: ________________________ Owners/Contractors Must Supply Copies of the Contractors Proof of Insurance coverage, Current Workers Comp Certificate. Please include Contractors Information Application with this form. Contractors must sign and acknowledge they have received/reviewed and will abide by the set rules and standards of the Hickory Point Property Owners Association. If this form is not completed, signed or included, approval will not be granted. Owners’ Signature: _______________________________________________________ Return Application and all Required Information to: Hickory Point Property Owners Association c/o (current President): Name:______________________________________________ Address:_______________________________________________________________ THIS SECTION TO BE COMPLETED BY THE HPPOA BOARD OFFICERS: Date Received: ________________________ Dates Reviewed: _____________ _______________ ________________ APPROVED APPROVED DENIED ** CONDITIONALLY* _______________ __________________ _____________ _______________ ___________________ ______________ (*)Requires and Explanation ________________________________________________________________________ ________________________________________________________________________ *APPLICATION MUST COMPLY WITH ABOVE CONDITIONS WITHIN 30 DAYS OF APPROVAL. REASON FOR DENIAL: ________________________________________________________________________________________________________________________________________________ ________________________________________________________________________ **APPLICANT MAY SUPPLY THE HPPOA WITH WRITTEN APPEAL WITHIN #) DAYS OF DENIAL. DESIGN REVIEW BOARD DECISIONS ARE DETERMINED BY A MAJORITY VOTE OF THE BOARD OFFICERS.
HPPOA PRESIDENT SIGNATURE:______________________________________ |